What are you looking for?

Meeting: Open Spaces – 21 September 2026

Committee: Open Spaces

Date: Monday, 21 September 2026 at 7:30 PM

Papers:

Venue

Rickards Hall

72a High Street
Edenbridge, TN8 5AR
Kent

View on Map

Agenda

2 Declarations of Interests, or Predeterminations

The disclosure must include the nature of the interest. If an interest becomes apparent to a member during the course of a meeting that has not been disclosed under this item, the member must immediately disclose it.

Members are reminded to the Code of Conduct, and Appendix B – Registering interests and nonparticipation.

3 Public Questions

Members of the public, and Members with prejudicial interests on items on the Agenda, may make representations, answer, ask questions and give evidence at this meeting in respect of items on the Agenda. (This is the only opportunity for the public to make a contribution during the meeting.) Both public and Members are limited to three minutes each to speak, and the total time allocated for public questions shall not exceed 15 minutes unless directed by the Chairman o f the meeting.

5 To Receive Analysis of Receipts and Payments to 15 September 2026

Attached is a copy of the income and expenditure from 1 April to 15 September 2026. To note:

Income:

311 Market Rents: Currently on target.

325 Sundry Receipts: Above target due to income generated from children’s fair. Was expected to return in August but the fair decided against it this year.

Expenditure:

3029 Bulky Waste Collection: This service has been cancelled

3055 Hanging Baskets & Plants: Came in under budget this year due to supplier change

Do Members have any comments?

7 Correspondence

A resident has raised concerns regarding the amount of litter and waste left at the Recreation Ground following the Edenbridge FC Football Festival held on 25 July 2026. The resident reported overflowing and untied rubbish bags, general litter including food waste, bottles, nappies and cigarette butts, and potential hazards to dogs using the field. They personally collected and secured several bags of rubbish.

The resident has also raised concerns regarding an increasing amount of dog fouling at the recreation ground and has asked whether any action can be taken to address this.

The Town Clerk has responded to the resident and made Edenbridge Rugby Club aware. The resident has also been informed that free dog waste dispensers have been introduced at several locations (including the Recreation Ground).

8 Facilities Manager's Report

The Grounds Team continues to undertake routine seasonal maintenance across the town. Current works include weed treatment, maintenance of planters throughout the town including Doggetts Barn and the cemetery flower beds, topping up sunken graves, pruning shrubs and bushes, sports pitch marking, grass cutting and watering.

The Council’s autumn pitch renovations are scheduled to take place at the end of September. Works will include light scarification and the application of approximately 100 tonnes of top dressing across the Council’s football and rugby pitches at the Recreation Ground and Nomads. These works have been made possible through grant funding received from the FA and form part of the Council’s ongoing programme to improve pitch surfaces and support year-round playability.

The annual review of the Grounds Team’s risk assessments has recently been completed. This included a review of manual handling assessments and all relevant safe systems of work.

The team has recently installed a new notice board at Stangrove Park.

Over the summer, the team has undertaken painting and maintenance of various items of street furniture throughout the town, including benches, bollards and railings.

Maintenance works have recently been completed to the paved area in front of the Wall of Remembrance. The area was initially jet washed, followed by repointing of the paving and the re-bedding of a section of slabs where required.

New fencing will shortly be installed at the allotments. This follows advice received from the local police following several reports of anti-social behaviour in the area.

The team will shortly extend the recently installed path at Mowshurst. The proposed works involve excavating an approximately 18m x 2m area, installing timber edging and infilling the path with woodchip. A quotation was obtained to complete the extension using the same aggregates as the existing path; however, at approximately £1,600, this was considered excessive. The woodchip option will therefore provide a more cost-effective solution.

8.1 Market Yard – Proposed Bin Storage Area

Following a recent spate of vandalism and inappropriate behaviour involving the bins in the Market Yard and the storage cupboard door, it is proposed that a secure bin storage area be created between the toilet block and the band hut. This would involve installing a gate across the alleyway between the two buildings, securing the bins while also providing an additional layer of security for the storage cupboard.

The cost of installing the gate would be £320.

Members are asked to consider and approve the proposed expenditure of £320 for these works.

8.2 Old Police Station Site – Landscaping Works

Following discussions with the Open Spaces Officer, plans have been developed to complete the landscaping of the former police station site on the High Street. The next phase of works will include turfing, the creation and planting of herbaceous borders, and the installation of fencing.

The Community Warden may be able to secure funding towards the cost of some of the plants, which could reduce the overall cost to the Council. The estimated cost of completing the works is £1,000 which could be funded from the Open Spaces earmarked reserves.

Members are asked to consider and approve expenditure of up to £1,000 to complete the landscaping works.

8.3 Stangrove Park – Replacement Commemorative Tree

Following the vandalism of the commemorative liquidambar tree in Stangrove Park earlier this year, prices have now been obtained for a suitable replacement.

The estimated cost of supplying and planting the replacement tree is approximately £400.

Members are asked to consider and approve expenditure of up to £400 for the replacement commemorative tree.

9 Open Spaces Business

Playground inspections: The annual playground inspections have been carried and we are waiting on the report, with the exception of Marsh Green Playground as this site is currently being upgraded. An update will be provided at the November meeting.

Tree survey: We are still waiting on the annual tree survey report, it is hoped that an update will be provided at the next meeting.

Gully clearing: The annual gulley clearing at the Market Yard Car Park was carried out on 4 September.

Pump maintenance: The pump servicing for the foul water pumping station at the Recreation Ground and the water feature pump at Mill Leat were carried out on 14 September.

Summer fun days: The annual summer fun days took place over four Thursdays in late July/August. The days were well attended. On one day the bouncy castle was unavailable due to the hot weather.

9.1.1 To receive the Burial Report

June: 1 burial; 0 ashes interments.

July: 0 burial; 0 ashes interment.

August: 0 burial; 0 ashes interments.

September (to date): 0 burials, 1 ashes interment.

9.1.2 New Cemetery Booklets

The new cemetery booklets have now been completed and are available for anyone who would like a copy.

The updated booklets provide useful information about the cemetery and are intended to offer a clear and accessible source of information for residents, visitors and anyone wishing to find out more.

In addition to the printed copies, the new cemetery booklets are also available to view electronically on the website. This will make the information more easily accessible and allow people to refer to the booklet online at their convenience.

10.1 Bandstand Project – progress update

Members are reminded that, following the tender process, contractors were appointed in April 2026 to deliver the Bandstand Project at Stangrove Park at a cost of up to £41,478.70 for the bandstand design and construction and £20,740 for the associated groundworks.

It was noted at the time that these costs reflected the agreed specification and that further amendments and expenditure would be required to accommodate the bandstand plinth and floor surface, internal roof finishes, planting, potential additional seating within the park, and the planning application fee. The project is funded through Sevenoaks District Council and Edenbridge Town Council Community Infrastructure Levy (CIL) allocations.

Since the appointment of the contractors, preparatory work has commenced to support a planning application for the bandstand. As the proposed structure will exceed the permitted development height limit of four metres, planning permission is required prior to installation.

The Town Clerk had engaged Turner & Hoskin to prepare the necessary planning documentation, including site plans, scaled drawings and supporting planning and design statements. Following a site meeting, the proposed location of the bandstand had been agreed, together with the associated hard landscaping, drainage arrangements and access provisions.

A Preliminary Ecological Appraisal (PEA) of the proposed site was undertaken in August 2026, and the Council had recently received the report. The PEA will form part of the supporting documentation accompanying the planning application, which is expected to be submitted shortly.

Both appointed contractors have been advised that the project timetable will be delayed while planning permission is sought. Given the planning timescales and the likely ground conditions during the autumn and winter months, it is considered sensible to work towards a March/April 2027 commencement date, subject to planning approval and suitable ground conditions.

10.2 Marsh Green Playground project

Members are reminded that, at the June 2026 meeting, Kompan was selected to deliver the Marsh Green Playground Project following consideration of the proposals received.

Following the appointment, the Open Spaces Officer attended a pre-start meeting with Kompan in August to discuss the practical arrangements for delivering the scheme. This included confirming the programme of works, anticipated timescales and arrangements for the site during the construction period.

The project has now moved into the construction phase, works commenced on 11 September 2026, in accordance with the agreed programme.

The works are expected to take approximately two to three weeks to complete, with completion currently anticipated during the week commencing 28 September 2026. This remains subject to progress on site and any unforeseen circumstances, including weather or ground conditions.

The Open Spaces Officer will continue to liaise with the contractor throughout the works and monitor progress against the agreed programme. Once the installation and associated works have been completed, the necessary checks will be undertaken prior to the new play facilities being opened for public use.

11 To confirm the expenditure under the annual works programme for the hedge cutting at Council sites £2,195.00

Prices have been sort for our routine seasonal hedge cutting. The contractor previously used has come back with a quote with no increase from the previous year and if approved this work will be scheduled for the coming months.

Do Members confirm to approve the expenditure of £2,195.00 plus VAT for annual hedge cutting?

12 To review and approve draft Volunteer/Community group policy for the hire of Open Spaces

At the June meeting, Members requested that a policy be developed to provide a clear and consistent approach to the hire of Stangrove Park by volunteer and community groups.

A draft Volunteer/Community Group Policy for the Hire of Open Spaces has subsequently been prepared for Members’ consideration. The policy is intended to establish the arrangements and criteria that will apply when volunteer and community groups request to hire Stangrove Park.

Members are asked to:

  1. Review the draft Volunteer/Community Group Policy for the Hire of Open Spaces; and
  2. Approve the policy, subject to any amendments agreed at the meeting.

13 To review and approve draft policy relating to the hire of Stangrove Park for exercise classes

At the June meeting, Members requested that a policy be developed to provide a clear and consistent approach to the hire of Stangrove Park for organised exercise and fitness classes.

A draft Policy for the Hire of Stangrove Park for Exercise Classes has subsequently been prepared for Members’ consideration. The policy is intended to establish the arrangements and criteria that will apply to individuals, instructors and organisations wishing to use Stangrove Park to deliver organised exercise or fitness classes.

Members are asked to:

  1. Review the draft Policy for the Hire of Stangrove Park for Exercise Classes; and
  2. Approve the policy, subject to any amendments agreed at the meeting.

14 To consider and approve plans submitted by the Rugby Club for the creation of an additional rugby pitch within the Recreation Ground

At the June meeting, Members considered a request from the Rugby Club for the creation of an additional rugby pitch within an area of the Recreation Ground that is not currently included within the Club’s lease.

The proposed pitch is intended to provide a smaller training/children’s pitch, primarily for junior rugby activities and coaching sessions.

The Committee approved the proposal in principle, subject to the Rugby Club submitting plans that were acceptable to the Council.

The Rugby Club has now submitted plans showing the proposed location and dimensions of the additional pitch. These plans are attached for Members’ consideration.

Members are asked to consider the submitted plans and determine whether to grant final approval for the creation of the additional rugby pitch.

15.1 To consider request for a memorial bench at Marsh Green

The Council has received a request for permission to install a memorial bench at Marsh Green.

The applicant has been advised of the costs associated with the provision and installation of the bench. The fees quoted are in line with the Council’s existing charges for memorial benches within the cemetery, together with the applicable maintenance fee.

Members are asked to consider whether they are satisfied for a memorial bench to be installed at Marsh Green and for the cemetery memorial bench charges and maintenance arrangements to be applied to this request.

The precise location of the bench would be agreed with the applicant and Council officers to ensure that it is appropriately positioned and does not adversely affect the use or maintenance of Marsh Green.

Do Members confirm to approve the request for a memorial bench at Marsh Green?

15.2 To consider a request for a memorial bench at The Recreation Ground

The Council has received a request for permission to install a memorial bench at the Recreation Ground

The applicant has been advised of the costs associated with the provision and installation of the bench. The fees quoted are in line with the Council’s existing charges for memorial benches within the cemetery, together with the applicable maintenance fee.

The family has subsequently requested that the resident fee, rather than the non-resident fee, be applied to the application due to their longstanding family and community connections with Edenbridge.

In support of their request, the family has advised that:

  • Their wider family has longstanding links with Edenbridge, with several generations having lived and grown up in the town.
  • Several members of the family are buried in Edenbridge Cemetery.
  • Members of the family have historically been actively involved in local organisations and community activities, including the town’s football club and bonfire society.
  • The deceased’s children continue to live in Edenbridge, together with a number of grandchildren and great-grandchildren.
  • The deceased’s brother also continues to live in Edenbridge.
  • Other close family members living in the surrounding area maintain strong connections with the Edenbridge community.

Members are therefore asked to consider whether these circumstances provide sufficient grounds to apply the resident rate and waive the additional non-resident maintenance fee and whether they are satisfied for a memorial bench to be installed at the Recreation Ground.

The precise location of the bench would be agreed with the applicant and Council officers to ensure that it is appropriately positioned and does not adversely affect the use or maintenance of the Recreation Ground.

Do Members confirm to approve the request for a memorial bench at the Recreation Ground to be charged at the resident rate?

16 To consider Edenbridge Allotment Garden Association (EAGA) request to allow non-Edenbridge residents to become plot holders

EAGA has advised that there are currently several vacant plots at the Forge Croft allotment site. The Swan Lane allotment site is currently fully occupied.

Section 8 of the current Allotment Tenancy Agreement states:

“The Tenant shall reside within Edenbridge parish during the tenancy except by prior agreement.”

EAGA has asked the Council to consider allowing greater flexibility in the application of this provision to enable vacant plots to be offered to individuals living outside Edenbridge parish.

EAGA has suggested introducing a sponsorship arrangement, whereby an existing plot holder could sponsor an individual from outside the parish who wishes to take on a vacant plot.

It is proposed that Edenbridge residents would continue to receive priority for allotment plots. Therefore, where there is limited availability or a waiting list, available plots would be offered to eligible Edenbridge residents before applications from individuals residing outside the parish are considered.

Allowing non-Edenbridge residents to take plots where there is no local demand could assist in ensuring that available allotment land remains cultivated and that plots do not remain vacant.

Should Members agree to the proposal, the existing Tenancy Agreement would need to be amended to reflect the agreed arrangements and clarify the eligibility and priority given to Edenbridge residents.

Members may wish to consider whether a sponsorship arrangement is necessary or whether the ability already provided within Section 8 to permit occupation “by prior agreement” could be used to manage applications from outside the parish.

Any revised arrangements should ensure that Edenbridge residents retain priority and clearly establish what happens should demand from Edenbridge residents subsequently increase.

Members are asked to:

  1. Determine whether to approve the allocation of available allotment plots to non-Edenbridge residents, subject to Edenbridge residents continuing to receive priority; and
  2. If approved, determine whether non-Edenbridge applicants should be required to obtain and complete a sponsorship form from an existing plot holder.

17 To approve of the use of the Council TN8 License by the Edenbridge Bonfire Society and ECCA (Edenbridge Community Christmas Association)

To seek Members’ approval for Edenbridge Bonfire Society and Edenbridge Community Christmas Association (ECCA) to make use of the Council’s TN8 Licence, if required, in connection with their respective forthcoming events.

Neither Edenbridge Bonfire Society nor ECCA has currently requested the use of the Council’s TN8 Licence.

However, with both organisations holding significant community events in the coming months, it would be prudent to have Members’ approval in place in advance should either organisation require use of the licence.

Obtaining approval at this stage would avoid the need to seek further Committee approval at short notice ahead of either event and would enable officers to facilitate use of the licence, where appropriate, should a request subsequently be received.

Any use of the Council’s licence would remain subject to the relevant licence conditions and any other requirements considered necessary by the Council.

Members are asked to:

  1. Approve, in principle, the use of the Council’s TN8 Licence by Edenbridge Bonfire Society and Edenbridge Community Christmas Association (ECCA) for their respective events, should its use be requested; and
  2. Delegate authority to the Clerk to agree the necessary arrangements, subject to compliance with the conditions of the licence and any other relevant requirements.

18 Solar Farm (Land North West Of Little Browns Railway Bridge Hilders Lane) – Community Benefit Fund

At the March Full Council meeting, Members resolved to accept the offer of a £40,000 Community Benefit Fund contribution from Kybo Solar Farm Limited to support the provision of additional electric vehicle (EV) charging infrastructure in Edenbridge. This was subject to confirmation from Sevenoaks District Council (SDC) that the contribution did not form part of a Section 106 Agreement.

SDC has now confirmed that the contribution is not connected to a Section 106 Agreement and that the Town Council is therefore able to accept the voluntary contribution outside of the planning process.

Members also resolved that potential locations for additional EV charging infrastructure should be investigated and brought back to Full Council or the Open Spaces Committee for further consideration.

Initial investigations have been undertaken and indicate that the only potentially viable Town Council-owned locations are:

  • Recreation Ground car park, adjacent to the Pavilion; and
  • Mowshurst car park.

Members are asked to consider:

  1. Whether officers should undertake further investigations into the feasibility of installing EV charging infrastructure at these locations.
  2. Whether Members consider both locations suitable for further investigation or wish to identify a preferred site.
  3. If a preferred site is to be identified at this stage, whether this should be the Recreation Ground car park or Mowshurst car park.

19 To consider and approve an ETC CIL bid for Old Police Station Site Improvements

The existing metal handrails at the Old Police Station site are dated, damaged and no longer considered suitable for the area. Their current condition detracts from the appearance of the site and replacement would provide a safer, more appropriate and visually improved installation.

It is proposed that the existing handrails are replaced with new, durable cast iron handrails suitable for the location.

It is also proposed to purchase new planters or hanging baskets for the area. These would help improve the appearance of the site and contribute to creating a more attractive and welcoming public space.

Costs for the replacement handrails are currently being obtained. Costs for suitable new planters/hanging baskets will also be identified. It is proposed that the expenditure be funded through available CIL monies, subject to eligibility and the necessary approvals. It is estimated that this would cost no more than £5,000.

Members are asked to:

  1. Approve in principle an ETC CIL bid for the replacement of the existing metal handrails at the Old Police Station site and the purchase of new planters/hanging baskets for the area.
  2. Authorise the final CIL application, subject to the quotations received being within the available CIL budget and in accordance with the Council’s financial procedures.

20.1 Streetlights maintenance replacement programme: 2026-27 Update

November 2025 Committee approved funding for the replacement of the remaining two steel columns and four 1985 concrete columns in 2026-27 through the 30-Year Maintenance Plan. It was also agreed that the replacement of 10 columns on Cedar Drive and Park Avenue would be funded through Community Infrastructure Levy (CIL) funds. In December, the CIL Board approved an award of £40,000 towards the replacement of these 10 concrete columns.

The replacement programme for 2026-27 is detailed below and includes five ageing steel columns and ten concrete columns on the Stangrove Estate.

The 2026-27 budget for the 30-Year Maintenance Plan was reduced from £25,000 to £15,000 in recognition of the £40,000 CIL funding allocation.

Below is the current list of proposed streetlight replacements, subject to costs remaining within the approved budget.

UKPN have confirmed the following dates for column replacements:

  • 8 and 9 Cedar Drive – 2 November
  • 11 and 13 Cedar Drive – 3 November
  • 14 and 16 Cedar Drive – 4 November
  • 19 Cedar Drive and 155 Park Avenue – 5 November
  • 158 Park Avenue – 6 November

Do Members have any questions?

Column No.

Road

CIL Funded  

Concrete

123

Marsh Green 

8

Cedar Drive

124

Marsh Green 

9

Cedar Drive

10

Cedar Drive

11

Cedar Drive

26

Church Street

13

Cedar Drive

244

Victoria Road

14

Cedar Drive

 

 

16

Cedar Drive

 

 

19

Cedar Drive

 

 

155

Park Avenue

 

 

158

Park Avenue

20.2 To consider and approve the replacement of 70W High Intensity Discharge (HID) streetlights

The Council’s streetlighting contractor has advised that 70W (and above) HID lamps are due to become obsolete from February 2027 as a result of the Restriction of Hazardous Substances (RoHS) regulations.

The Council currently has eight 70W HID streetlights that will be affected.

Seven of the affected lights can be replaced at a cost of £375 each, giving a total of £2,625 + VAT.

Light No. 97 at The Old School House, Lingfield Road, is a wall-mounted Windsor-style fitting and requires a different replacement, at a cost of £1,395 + VAT.

The total cost to replace all eight affected streetlights is therefore £4,020 + VAT.

Replacing the fittings in advance of the February 2027 changes would ensure that the Council is not reliant on obsolete HID lamps and would reduce the risk of being unable to source replacement lamps when existing units fail.

Members are asked to:

  1. Note that 70W and above HID lamps are due to become obsolete from February 2027;
  2. Approve the replacement of the eight affected Council owned streetlights; and
  3. Approve expenditure of £4,020 + VAT for the replacement works.

Light number

Location

Postion

45

Fairmead Road

Outside Plum Cottage

97

Lingfield Road

Opposite No.9 on the Old School House

104

Market Yard Car Park

Junction with Frantfield

105

Market Yard Car Park

Right hand side of entrance

106

Market Yard Car Park

Halfway along wall by Croft Court

108

Market Yard Car Park

By Churchyard wall

121

Marsh Green Road

On apex of green

128

Mead Road

Outside Mead House

Minutes

Pending approval and adoption. These minutes are published but are still pending approval and adoption.

1 Apologies for Absence

Apologies were received, noted and accepted from Cllr’s Gemmell Smith, Stockdale, Compton, Streets and McGregor.

2 Declarations of Interests, or Predeterminations

Cllr Jacques declared an interest in The Edenbridge Bonfire Society

3 Public Questions

Chair closed the meeting 19:32

A member of the public spoke on item 16 on the agenda. He explained why the Edenbridge Allotment Garden Association (EAGA) had requested to allow non-Edenbridge residents to become plot holders.

Chair opened the meeting 19:33

The Chairman proposed to bring forward agenda item 16 for discussion following the procedural items, as there were representatives from the public present. Members agreed unanimously and,

Resolved: to bring forward items 16 to be discussed before proceeding with other items on the agenda. Details are minuted sequentially to follow the agenda order.

4 To receive, approve and sign the minutes of the Open Spaces Meeting held on 15 June 2026 (pages 2023-142/1-8).

Resolved: that the minutes of the Open Spaces Committee 15 June 2026 be signed by the Chair as a true and accurate record of the meeting (pages 2023-142/1-8).

5 To Receive Analysis of Receipts and Payments to 15 September 2026

Members noted the income and expenditure from 1 April 2025 to 15 September 2026.

Members had no comments.

7 Correspondence

Members noted the following correspondence:

A resident had raised concerns regarding the amount of litter and waste left at the Recreation Ground following the Edenbridge FC Football Festival on 25 July 2026. Issues included overflowing rubbish bags, general litter and potential hazards to dogs. The resident had also reported an increase in dog fouling and enquired whether action could be taken.

The Town Clerk had responded to the resident and made Edenbridge Rugby Club aware of the concerns. The resident had also been informed that free dog waste dispensers had been introduced at several locations, including the Recreation Ground.

8 Facilities Manager's Report

Members noted that the grounds team had continued routine seasonal maintenance across the town, including weed treatment, planter maintenance, grave topping, pruning, pitch marking, grass cutting and watering.

Autumn pitch renovations had been scheduled for the end of September, including scarification and approximately 100 tonnes of top dressing at the Recreation Ground and Nomads, funded by an FA grant.

The annual review of the Grounds Team’s risk assessments had been completed, and a new notice board had been installed at Stangrove Park. Painting and maintenance of street furniture had also been undertaken, alongside repairs to the paved area at the Wall of Remembrance.

New fencing had been planned for the allotments following police advice regarding anti-social behaviour. An extension to the Mowshurst path had also been planned using woodchip as a more cost-effective alternative to the quoted £1,600 aggregate option.

8.1 Market Yard – Proposed Bin Storage Area

Following a spate of vandalism and inappropriate behaviour involving the bins in the Market Yard and the storage cupboard door, it was proposed that a secure bin storage area be created between the toilet block and the band hut. This would have involved installing a gate across the alleyway between the two buildings, securing the bins while also providing an additional layer of security for the storage cupboard.

The cost of installing the gate was £320. Members,

Resolved: to approve the proposed expenditure of £320 for the installation of a gate across the alleyway.

8.2 Old Police Station Site – Landscaping Works

Following discussions with the Open Spaces Officer, plans had been developed to complete the landscaping of the former police station site on the High Street. The next phase of works would include turfing, the creation and planting of herbaceous borders, and the installation of fencing.

The Community Warden may have been able to secure funding towards the cost of some of the plants, which would reduce the overall cost to the Council. The estimated cost of completing the works was £1,000 which would be funded from the Open Spaces earmarked reserves. Members discussed planting options and requested that in light of the warm and dry summer, and the likelihood of this becoming the norm moving forward, that drought resistant plants and shrubs, such as lavender, be planted. Members,

Resolved: to approve expenditure of up to £1,000 to complete the landscaping works.

8.3 Stangrove Park – Replacement Commemorative Tree

Following the vandalism of the commemorative liquidambar tree in Stangrove Park earlier this year, prices had been obtained for a suitable replacement.

The estimated cost of supplying and planting the replacement tree was approximately £400. Members,

Resolved: approve expenditure of up to £400 for the replacement commemorative tree.

9 Open Spaces Business

Members noted the Open Spaces business including:

Playground inspections: The annual playground inspections had been carried and we were waiting on the report, with the exception of Marsh Green Playground as this site was being upgraded at the time. An update would be provided at the November meeting.

Tree survey: We were still waiting on the annual tree survey report, it was hoped that an update would be provided at the next meeting.

Gully clearing: The annual gulley clearing at the Market Yard Car Park was carried out on 4 September.

Pump maintenance: The pump servicing for the foul water pumping station at the Recreation Ground and the water feature pump at Mill Leat were carried out on 14 September.

Summer fun days: The annual summer fun days took place over four Thursdays in late July/August. The days were well attended. On one day the bouncy castle was unavailable due to the hot weather.

9.1.1 To receive the Burial Report

Members noted the following burial report:

June: 1 burial; 0 ashes interments.

July: 0 burial; 0 ashes interment.

August: 0 burial; 0 ashes interments.

September (to date): 0 burials, 1 ashes interment.

9.1.2 New Cemetery Booklets

Members noted that the new cemetery booklets were complete and were available for anyone who would like a copy.

The updated booklets provided useful information about the cemetery and are intended to offer a clear and accessible source of information for residents, visitors and anyone wishing to find out more.

In addition to the printed copies, the new cemetery booklets were also available to view electronically on the website. This would make the information more easily accessible and allow people to refer to the booklet online at their convenience.

10.1 Bandstand Project – progress update

Members were reminded that contractors had been appointed in April 2026 for the Stangrove Park Bandstand Project, at costs of up to £41,478.70 for design and construction and £20,740 for groundworks, funded through CIL allocations. Additional costs had been anticipated for associated finishes, landscaping and planning requirements.

Preparatory planning work had commenced, with Turner & Hoskin appointed to prepare the application documents. The bandstand location, landscaping, drainage and access arrangements had been agreed, and a Preliminary Ecological Appraisal had been completed.

Both contractors had been advised of delays due to the planning process, with works provisionally scheduled to commence in March/April 2027, subject to planning approval and suitable ground conditions.

Members had no questions but did request that the work was completed as soon as possible, dependant on planning permission and weather conditions.

10.2 Marsh Green Playground project

Members were reminded that Kompan had been appointed in June 2026 to deliver the Marsh Green Playground Project. A pre-start meeting had taken place in August to agree the programme and site arrangements.

Construction works had commenced on 11 September 2026, with completion anticipated during the week commencing 28 September, subject to weather and site conditions. The Open Spaces Officer was to continue monitoring progress, with safety checks required before the playground could reopen to the public.

11 To confirm the expenditure under the annual works programme for the hedge cutting at Council sites £2,195.00

Prices had been sought for the routine seasonal hedge cutting. The contractor used previously had come back with a quote and if approved this work would be scheduled for the coming months. Members,

Resolved: to approve the expenditure of £2,300.00 plus VAT for annual hedge cutting.

12 To review and approve draft Volunteer/Community group policy for the hire of Open Spaces

At the June meeting, Members requested that a policy be developed to provide a clear and consistent approach to the hire of Stangrove Park by volunteer and community groups.

A draft Volunteer/Community Group Policy for the Hire of Open Spaces had subsequently been prepared for Members’ consideration. The policy was intended to establish the arrangements and criteria that would apply when volunteer and community groups requested to hire Stangrove Park. Members reviewed the draft policy and,

Resolved: to approve the draft policy with no amendments.

13 To review and approve draft policy relating to the hire of Stangrove Park for exercise classes

At the June meeting, Members requested that a policy be developed to provide a clear and consistent approach to the hire of Stangrove Park for organised exercise and fitness classes.

A draft Policy for the Hire of Stangrove Park for Exercise Classes had subsequently been prepared for Members’ consideration. The policy was intended to establish the arrangements and criteria that will apply to individuals, instructors and organisations wishing to use Stangrove Park to deliver organised exercise or fitness classes. Members reviewed the policy and,

Resolved: to approve the draft policy, without any amendments.

14 To consider and approve plans submitted by the Rugby Club for the creation of an additional rugby pitch within the Recreation Ground

At the June meeting, Members considered a request from the Rugby Club for the creation of an additional rugby pitch within an area of the Recreation Ground that was not included within the Club’s lease.

The proposed pitch was intended to provide a smaller training/children’s pitch, primarily for junior rugby activities and coaching sessions.

The Committee approved the proposal in principle, subject to the Rugby Club submitting plans that were acceptable to the Council.

The Rugby Club had subsequently submitted plans showing the proposed location and dimensions of the additional pitch. These plans were attached for Members’ consideration. Members reviewed the plans and,

Resolved: to approve the creation of an additional rugby pitch at the Recreation Ground.

15.1 To consider request for a memorial bench at Marsh Green

The Council had received a request for permission to install a memorial bench at Marsh Green.

The applicant had been advised of the costs associated with the provision and installation of the bench. The fees quoted were in line with the Council’s existing charges for memorial benches within the cemetery, together with the applicable maintenance fee.

Members were asked to consider whether they were satisfied for a memorial bench to be installed at Marsh Green and for the cemetery memorial bench charges and maintenance arrangements to be applied to this request.

The precise location of the bench would be agreed with the applicant and Council officers to ensure that it was appropriately positioned and did not adversely affect the use or maintenance of Marsh Green. Members considered the request and,

Resolved: to approve the request for a memorial bench at Marsh Green.

15.2 To consider a request for a memorial bench at The Recreation Ground

The Council had received a request to install a memorial bench at the Recreation Ground. The applicant had been advised of the associated costs, based on the Council’s existing cemetery memorial bench charges.

The family had requested that the resident rate be applied and the additional non-resident maintenance fee waived, citing longstanding family and community connections with Edenbridge, including relatives living and buried in the town and involvement in local organisations.

Members were asked to consider whether the resident rate and fee waiver were appropriate and whether permission should be granted for the bench, with its location to be agreed between the applicant and Council officers. Members considered the request and,

Resolved: to approve the request for a memorial bench at the Recreation Ground and for it to be charged at the resident rate.

16 To consider Edenbridge Allotment Garden Association (EAGA) request to allow non-Edenbridge residents to become plot holders

EAGA had advised that several allotment plots remained vacant at Forge Croft, while Swan Lane was fully occupied. EAGA had requested greater flexibility in allowing non-Edenbridge residents to take on vacant plots, suggesting a sponsorship arrangement through existing plot holders.

It was proposed that Edenbridge residents would retain priority, with plots offered to non-residents only where there was no local demand, helping to ensure plots remained cultivated.

Members were asked to consider whether a sponsorship scheme was necessary or whether the existing provision for occupation by prior agreement could be used. Any agreed changes would require clarification within the Tenancy Agreement, including arrangements should demand from Edenbridge residents increase. Members considered the request and,

Resolved: to approve the allocation of available allotment plots to non-Edenbridge residents, subject to Edenbridge residents continuing to receive priority; and

Resolved: to confirm that non-Edenbridge applicants should be required to obtain and complete a sponsorship form from an existing plot holder.

17 To approve of the use of the Council TN8 License by the Edenbridge Bonfire Society and ECCA (Edenbridge Community Christmas Association)

Members were asked to consider approving the use of the Council’s TN8 Licence by Edenbridge Bonfire Society and Edenbridge Community Christmas Association (ECCA) for their forthcoming events, should it be required.

Neither organisation had requested use of the licence, but advance approval was sought to avoid the need for further Committee approval at short notice. Any use would remain subject to the relevant licence conditions and Council requirements. Members,

Resolved: to approve the use of the Council’s TN8 Licence by Edenbridge Bonfire Society and Edenbridge Community Christmas Association (ECCA) for their respective events, should its use be requested; and,

Resolved: to delegate authority to the Clerk to agree the necessary arrangements, subject to compliance with the conditions of the licence and any other relevant requirements.

18 Solar Farm (Land North West Of Little Browns Railway Bridge Hilders Lane) – Community Benefit Fund

Members were reminded that Full Council had agreed in March to accept a £40,000 Community Benefit Fund contribution from Kybo Solar Farm Limited towards additional EV charging infrastructure, subject to confirmation that the funding was not linked to a Section 106 Agreement.

Sevenoaks District Council had subsequently confirmed that the contribution was independent of the planning process and could be accepted.

Initial investigations into suitable Town Council-owned sites had identified the Recreation Ground car park, adjacent to the Pavilion, and Mowshurst car park as the only potentially viable locations for further consideration.

Members were asked to consider the locations and whether they would like officers to conduct further investigations for other locations. After discussion, Members,

Resolved: to confirm that the Recreation Ground Car Park was the most suitable location and is the preferred site for the installation of EV chargers.

19 To consider and approve an ETC CIL bid for Old Police Station Site Improvements

Members were advised that the existing handrails at the Old Police Station site were damaged and outdated, and replacement with durable cast iron handrails had been proposed to improve safety and appearance.

New planters or hanging baskets had also been proposed to enhance the area. Quotations were being sought, with total costs estimated at no more than £5,000, potentially funded through available CIL monies, subject to eligibility and approval. Members,

Resolved: to approve an ETC CIL bid for the replacement of the existing metal handrails at the Old Police Station site and the purchase of new planters/hanging baskets for the area.

20.1 Streetlights maintenance replacement programme: 2026-27 Update

Members noted the following:

Funding had been approved for the 2026–27 streetlight replacement programme, including ageing steel columns and ten concrete columns on the Stangrove Estate. A £40,000 CIL contribution had been awarded towards replacing columns on Cedar Drive and Park Avenue, allowing the 30-Year Maintenance Plan budget to be reduced from £25,000 to £15,000.

UKPN had confirmed that column replacements were scheduled to take place between 2 and 6 November 2026, subject to approved budgets.

Members had no questions.

20.2 To consider and approve the replacement of 70W High Intensity Discharge (HID) streetlights

The Council’s streetlighting contractor had advised that 70W (and above) HID lamps were due to become obsolete from February 2027 under Restriction of Hazardous Substances (RoHS) regulations, affecting eight Council streetlights.

Seven lights could be replaced at £375 each (£2,625 + VAT), while the Windsor-style wall-mounted fitting at The Old School House, Lingfield Road, required replacement at £1,395 + VAT.

The total estimated cost was £4,020 + VAT. Replacement ahead of February 2027 was recommended to avoid reliance on obsolete lamps and potential difficulties sourcing replacements. Members noted that the lamps are due to become obsolete from next year and,

Resolved: to approve the replacemnt of eight affected Council owned streetlights; and,

Resolved: to approve the expenditure of £4,020 plus VAT for the replacement works.

21 News Release

Members requested that the new Marsh Green Playground was advertised.

Latest News and Updates

Follow us on: